2000
DOI: 10.1109/77.828518
|View full text |Cite
|
Sign up to set email alerts
|

Test results of a 10 kA current lead using Ag/Au stabilized Bi-2223 tapes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2001
2001
2009
2009

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…In 1995-1996, a test facility for 10 kA high-temperature superconducting current leads was built at CRPP [3]. The test station included a 12 kA DC power supply, a medium size cryostat connected to the main CRPP helium refrigerator by a supercritical helium transfer line and a 96 channels data acquisition system.…”
Section: Specification and Designmentioning
confidence: 99%
“…In 1995-1996, a test facility for 10 kA high-temperature superconducting current leads was built at CRPP [3]. The test station included a 12 kA DC power supply, a medium size cryostat connected to the main CRPP helium refrigerator by a supercritical helium transfer line and a 96 channels data acquisition system.…”
Section: Specification and Designmentioning
confidence: 99%
“…(2) Design and test of a 10 kA HTS current lead using the selected material also done at CRPP. (3) Design and test of a 20 kA HTS current lead to prove the modularity and scale-ability of the design. The test has been performed together with the National Institute for Fusion Science (NIFS) in the frame of the LHD International Mutual Experiment (LIME) project.…”
Section: Introductionmentioning
confidence: 99%
“…Two 10 kA HTS modules were manufactured in industry and successfully tested in a test facility at CRPP [ 3 ] . In part 3 of the task, the two 10 kA HTS modules are connected in parallel to form a 20 kA HTS module.…”
Section: Introductionmentioning
confidence: 99%