Bridge Maintenance, Safety, Management and Life Extension 2014
DOI: 10.1201/b17063-159
|View full text |Cite
|
Sign up to set email alerts
|

Test to failure of a steel truss bridge – Calibration of assessment methods

Abstract: The steel truss railway bridge at Åby River was built in 1957 with a span of 32 m (105 feet). In 2012 it was replaced by a new steel beam bridge and the old bridge was placed beside the river. It was tested to failure to study its remaining load-carrying capacity in September 2013. The test was carried out by Luleå University of Technology bycommission from Trafikverket as a part of the European Research Project MAINLINE (www.mainline-project.eu).In this paper some preliminary results are given. Two hydraulic … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 1 publication
0
0
0
Order By: Relevance