2008
DOI: 10.5194/sd-6-32-2008
|View full text |Cite
|
Sign up to set email alerts
|

The CO<sub>2</sub>SINK Boreholes for Geological Storage Testing

Abstract: No abstract available. <br><br> doi:<a href="http://dx.doi.org/10.2204/iodp.sd.6.04.2008" target="_blank">10.2204/iodp.sd.6.04.2008</a>

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
22
0

Year Published

2009
2009
2020
2020

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 48 publications
(22 citation statements)
references
References 6 publications
0
22
0
Order By: Relevance
“…The green lines indicate the ERT cable and the location of the ERT (electrical resistivity array) sensors (green stars). Sandstone reservoir intervals are shown in yellow (Prevedel et al, 2009). …”
Section: Figmentioning
confidence: 99%
See 1 more Smart Citation
“…The green lines indicate the ERT cable and the location of the ERT (electrical resistivity array) sensors (green stars). Sandstone reservoir intervals are shown in yellow (Prevedel et al, 2009). …”
Section: Figmentioning
confidence: 99%
“…A staged cementation program was performed in combination with the application of a newly developed, swellable rubber packer technology and a stage cementation downhole tool. This approach was performed instead of the perforation work inside the final casing at the reservoir face to protect the sensor cables (Prevedel et al, 2009). Fine-mesh filter screens with a mesh size of 1.5 mm were used because the Stuttgart formation was expected to be weakly consolidated.…”
Section: Figmentioning
confidence: 99%
“…During the coring operations in all three wells, KCl/CaCO 3 /carboxymethyl cellulose (CMC) -based drilling mud was used (Prevedel et al, 2008). To preserve the environment, the amount of tracer employed was kept to a low level that still enabled sensitive detection of the drilling mud (1 mg/l, personal communication Y. K. Kharaka, USGS).…”
Section: Fluorescein Labelling Of Drilling Mudmentioning
confidence: 99%
“…Three 750 to 800 m deep vertical wells, Ktzi 200, 201 and 202, were drilled from March to September of 2007. Core sections 89 mm in diameter composed mainly of clay and sandstone (Förster et al, 2009) were recovered from the storage horizon using a wire-line coring system (Prevedel et al, 2009). After well establishment, hydraulic tests (Wiese et al, 2010) and nitrogen lifts were performed.…”
Section: Study Sitementioning
confidence: 99%
“…• Well design, drilling and completion of three smart wells, containing a variety of permanently installed downhole sensors for the continuous monitoring of the CO 2 in the reservoir (Prevedel et al (2008(Prevedel et al ( , 2009Möller et al (2012)). …”
Section: Co 2 Storage and Scientific Program At The Ketzin Pilot Sitementioning
confidence: 99%