2018
DOI: 10.1088/1748-0221/13/07/p07010
|View full text |Cite
|
Sign up to set email alerts
|

The implementation of Global Feature EXtractor (gFEX) - the ATLAS Calorimeter Level 1 Trigger system for LHC Run-3 upgrade

Abstract: As part of the ATLAS Phase-I Upgrade, the global Feature EXtractor (gFEX) is one of several hardware modules designed to help maintain the ATLAS Level-1 trigger acceptance rate with the increasing Large Hadron Collider (LHC) luminosity and the increasing Pile-Up conditions. The gFEX is used to identify patterns of energy associated with the hadronic decays of high momentum Higgs, W & Z bosons, top quarks, and exotic particles in real time at the 40 MHz LHC bunch crossing rate. The board is requir… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…To meet the challenges of the high-luminosity environment (much higher event rates and pileup level), several major upgrades will be installed during the LS2 in the ATLAS detector [1]. As a part of the updates, the Level-1 calorimeter (L1Calo) trigger will be upgraded to exploit finer granularity data than Run 2 by using a new system of 3 feature extraction (FEXs) modules: electromagnetic FEX (eFEX) [2], jet FEX (jFEX) [3] and global FEX (gFEX) [4]. Figure 1(a) shows the L1Calo system for the Phase-I upgrade [5].…”
Section: Introductionmentioning
confidence: 99%
“…To meet the challenges of the high-luminosity environment (much higher event rates and pileup level), several major upgrades will be installed during the LS2 in the ATLAS detector [1]. As a part of the updates, the Level-1 calorimeter (L1Calo) trigger will be upgraded to exploit finer granularity data than Run 2 by using a new system of 3 feature extraction (FEXs) modules: electromagnetic FEX (eFEX) [2], jet FEX (jFEX) [3] and global FEX (gFEX) [4]. Figure 1(a) shows the L1Calo system for the Phase-I upgrade [5].…”
Section: Introductionmentioning
confidence: 99%