1997
DOI: 10.2166/wst.1997.0695
|View full text |Cite
|
Sign up to set email alerts
|

The inspection of actual runoff control facilities five years after construction

Abstract: This report describes runoff control facilities (five years after construction) which are basically an athletic field consisting of tennis courts, constructed in an area of about four hectares in Tokyo. The report is divided into three parts. The first part deals with the social background of the fact that the athletic field has come to have runoff control functions. The second part concerns the summary of these facilities, and then the last part relates to the effects of runoff control. Concerning the effects… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2003
2003
2003
2003

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…P eri-implant disease ("periimplantitis") manifests as a microbial plaque-induced inflammatory process, [1][2][3][4][5] which could be preceded by occlusal overload 6 affecting the soft tissues and bone around osseointegrated dental implants. Left untreated, this condition will in most instances lead to progressive bone loss, implant loss, and the need for revisional treatment.…”
mentioning
confidence: 99%
“…P eri-implant disease ("periimplantitis") manifests as a microbial plaque-induced inflammatory process, [1][2][3][4][5] which could be preceded by occlusal overload 6 affecting the soft tissues and bone around osseointegrated dental implants. Left untreated, this condition will in most instances lead to progressive bone loss, implant loss, and the need for revisional treatment.…”
mentioning
confidence: 99%