The Method of Reducing Drilling Costs More Than 50 Percent

Abstract: This paper shows how using the Drilling Gptimization Simulator (DROPS) has been applied in the planning phase of two North Sea wells. Both the 12.25" and the 8.5" sections were optimized on Well #1 and the 12.25" section was optimized on Well #2. Geological Drilling Logs (GDLs) were generated from offset drilling data in the same field for both the two wells. Both wells with the different hole sections were simulated with the available bit types and designs. The optimum bit selection and the drilling parameter… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2010
2010
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The ultimate goal of developing a drilling simulation is to optimize the entire process so the lowest cost per foot is achieved [17]. Therefore, several simulations need to be conducted for every section of the wellbore to ensure the optimum parameters are achieved.…”
Section: Developing the Simulationmentioning
confidence: 99%
“…The ultimate goal of developing a drilling simulation is to optimize the entire process so the lowest cost per foot is achieved [17]. Therefore, several simulations need to be conducted for every section of the wellbore to ensure the optimum parameters are achieved.…”
Section: Developing the Simulationmentioning
confidence: 99%
“…By optimizing horizontal well design, costs can be significantly decreased by having shorter footage and arriving at the shortest pathway, which lowers the well's cost per foot [4]. The same well design expertise should be applied to deviated wells so that the trajectory's kickoff-point and other significant points are as efficient as possible [1]. In order to satisfy the customer, the Bottom Hole Assembly should be suggested.…”
Section: Introductionmentioning
confidence: 99%