2021
DOI: 10.1016/j.dibe.2020.100039
|View full text |Cite
|
Sign up to set email alerts
|

The promise of automated compliance checking

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
59
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 59 publications
(59 citation statements)
references
References 28 publications
0
59
0
Order By: Relevance
“…A model-based submission process has the advantage that geometric and semantic information from the applicant's model can be checked for legal compliance by software partly in an automatic way (Eastman et al, 2009;Malsane et al, 2015;Armor and Dimyadi, 2021). The basis for the model-based check is the creation of a survey plan in which land, public facilities (e.g., roads, hydrants), building site, alignment lines, neighbouring buildings (e.g., sight distance), and important parameters and provisions of the zoning plan are included.…”
Section: Openbim Submission Process As a Basis For The Use Of Armentioning
confidence: 99%
“…A model-based submission process has the advantage that geometric and semantic information from the applicant's model can be checked for legal compliance by software partly in an automatic way (Eastman et al, 2009;Malsane et al, 2015;Armor and Dimyadi, 2021). The basis for the model-based check is the creation of a survey plan in which land, public facilities (e.g., roads, hydrants), building site, alignment lines, neighbouring buildings (e.g., sight distance), and important parameters and provisions of the zoning plan are included.…”
Section: Openbim Submission Process As a Basis For The Use Of Armentioning
confidence: 99%
“…The production of construction drawings during the design process can no longer be considered a series of repetitive isolated tasks. The data-rich models produced through BIM-based design can lead to a more comprehensive analysis of the proposed structure; consequently, optimal solutions can be iteratively identified [41,42]. Combined with 4D BIM, a connection can be established among accurate material quantity data, the defined time by which each delivery is required for incorporation into the general structure, and the exact location the materials will be required.…”
Section: Building Information Modelling For Logistics Managementmentioning
confidence: 99%
“…BMC systems often consist of comprehensive and complex automated processes that are challenging for the users to comprehend (Hjelseth 2015, Preidel and Borrmann 2016, Ghannad et al 2019, Amor and Dimyadi 2020. So as not to overwhelm the users, they then tend to black-box most of the processes, leaving a set of specific parameters open for adjustment.…”
Section: Black-boxed Bmc-systemsmentioning
confidence: 99%
“…So as not to overwhelm the users, they then tend to black-box most of the processes, leaving a set of specific parameters open for adjustment. However, as Amor & Dimyadi (2021) argues, it is problematic for user validation of BMC systems. Moray et al (2000) argue that the more comprehensive and complex the information processes are, such as BIM-based model checks, the less able users are to comprehend the processes.…”
Section: Black-boxed Bmc-systemsmentioning
confidence: 99%
See 1 more Smart Citation