2022
DOI: 10.20291/2079-0392-2022-2-74-84
|View full text |Cite
|
Sign up to set email alerts
|

Throughput capacity of a single-track stage when designing a double-track insert

Abstract: At the present stage of development of the railway transport infrastructure, the construction of double-track inserts can be considered as the first stage of strengthening the throughput and carrying capacity before the construction of the second continuous main tracks. In this study, the regulatory documentation that establishes the procedure for calculating and analyzing the capacity of double-track crossings is analyzed, dependent, conditionally independent and unaccounted factors affecting the capacity are… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles