Time and cost optimization using fuzzy goal programming

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
5
3

Relationship

3
5

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 8 publications
0
6
0
Order By: Relevance
“…The goal of this optimization is to find optimum trade-off from time and cost spent for a project or system. Optimization could be done by several method, like PERT and Goal Programming [25], and fuzzy goal programming to optimize time and cost [33]. Goal programming is one of the widely used methods, and Data Envelopment Analysis (DEA) is one of goal programming formulation that could be used to define system efficiency.…”
Section: Optimizationmentioning
confidence: 99%
“…The goal of this optimization is to find optimum trade-off from time and cost spent for a project or system. Optimization could be done by several method, like PERT and Goal Programming [25], and fuzzy goal programming to optimize time and cost [33]. Goal programming is one of the widely used methods, and Data Envelopment Analysis (DEA) is one of goal programming formulation that could be used to define system efficiency.…”
Section: Optimizationmentioning
confidence: 99%
“…Generalization value ranges from 0 to 1, where 0 means the model shows specific form from the event logs, while 1 means it shows a more flexible form as a comparation from event logs discovery of nodes. Generalization value (GV) could be measured by (4).…”
Section: Sv = 1 -Duplicate Activities + Missing Activities Nodes On Model (2) -Precisionmentioning
confidence: 99%
“…Nowadays, process mining become more popular in organization or company because by using its methods organization could easily capture information from each transaction happened [2]. Some previous research used program evaluation and review technique (PERT) [3] and goal programming [4] to optimize time and cost, where PERT is used to select optimal trace of the project and Goal Programming defined the goal itself. In this research, fuzzy miner approach will be used to extract process model with less structured processes [5].…”
Section: Introductionmentioning
confidence: 99%
“…The GP model was enhanced using fuzzy set theory [22] to manage uncertainty data, resulting in FGP. The main goal is to improve the ability of FGP to deal with the nature of uncertainty when modeling problems [26,27]. Uncertainties are frequently related to the goal objectives in a case such as a production planning model.…”
Section: Fuzzy Goal Programming (Fgp)mentioning
confidence: 99%