2020 5th International Conference on Smart Grid and Electrical Automation (ICSGEA) 2020
DOI: 10.1109/icsgea51094.2020.00020
|View full text |Cite
|
Sign up to set email alerts
|

Topology Verification Method of Low-Voltage Distribution Network based on T-type Grey Correlation Degree

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 4 publications
0
5
0
Order By: Relevance
“…By analyzing the historical data of workers, the structure establishes a database of dangerous sources to realize real-time monitoring and early warning of workers; And push the relevant information to the risk identification algorithm, and automatically judge whether the operator is in the hazard according to the historical data in the hazard database and the site environmental conditions. This structure can timely and accurately identify the potential hazards in the power aerial work scene, and realize real-time monitoring and early warning of the potential hazards in the power aerial work scene [7][8]. Aiming at the risk of major hazards in a specific power aerial work scene, the structure of hazards in the power aerial work scene is deeply analyzed in order to effectively identify and deal with potential risks.…”
Section: Analysis Of the Structure Of Hazard Sources In Electric Aeri...mentioning
confidence: 99%
See 1 more Smart Citation
“…By analyzing the historical data of workers, the structure establishes a database of dangerous sources to realize real-time monitoring and early warning of workers; And push the relevant information to the risk identification algorithm, and automatically judge whether the operator is in the hazard according to the historical data in the hazard database and the site environmental conditions. This structure can timely and accurately identify the potential hazards in the power aerial work scene, and realize real-time monitoring and early warning of the potential hazards in the power aerial work scene [7][8]. Aiming at the risk of major hazards in a specific power aerial work scene, the structure of hazards in the power aerial work scene is deeply analyzed in order to effectively identify and deal with potential risks.…”
Section: Analysis Of the Structure Of Hazard Sources In Electric Aeri...mentioning
confidence: 99%
“…In the specific scene of electric aerial work, the standard position of operators is calibrated. Calculate the trajectory distance between the standard point and the personnel position point, as shown in Formula (7).…”
Section: Locate the Abnormal Points Of Personnel In Aerial Work Scenementioning
confidence: 99%
“…The theory and method of grey correlation degree [6] the measure of the correlation of the factors between two systems that change with time or different objects is called correlation degree. In the process of system development, if the changing trend of the two factors is consistent, that is, the degree of synchronous change is high, it can be said that the degree of correlation between the two is high; On the contrary, it is lower.…”
Section: Determination Of Objective Index Weight By Grey Correlation ...mentioning
confidence: 99%
“…The low-voltage distribution network covers a wide range of areas with dense personnel activities [1][2] , which is prone to leakage faults. At present, low-voltage distribution networks mostly use the residual current protective device (RCD) to realize leakage protection [3] .…”
Section: Introductionmentioning
confidence: 99%