2019
DOI: 10.5194/isprs-archives-xlii-2-w11-301-2019
|View full text |Cite
|
Sign up to set email alerts
|

Towards a Semantic Based Hub Platform of Vaulted Systems: Hbim Meets a Geodb

Abstract: In the last years many efforts have been invested in the cultural heritage digitization: surveying, modelling, diagnostic analysis and historic data collection. Nowadays, this effort is finalized in many cases towards the Historical Building Information Modelling. The number of informative models testifying the multifaceted richness and unicity of the architectural heritage and its components is progressively increasing. Information and Model are generally acquired under researches and analysis phases addresse… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 5 publications
0
5
0
Order By: Relevance
“… Information sharing: the development of a cloud platform (Brumana et al, 2019;Mazzetti et al, 2015), to share data and informative models, as historical databases, schedules based on the automatic extraction of information previously included in the HBIM modelling and to create an immersive interactive environment (VR and AR) for different types of users (experts, non-experts and tourists) and devices (desktop, mobile, VR headset). Even if the process is not yet automatized, the possibility to have different models and data available within a virtual hub platform will open to the VR/AR/MR developers the possibility to enrich the narratives with validated research and related information.…”
Section: Related Work and Research Objectivesmentioning
confidence: 99%
See 1 more Smart Citation
“… Information sharing: the development of a cloud platform (Brumana et al, 2019;Mazzetti et al, 2015), to share data and informative models, as historical databases, schedules based on the automatic extraction of information previously included in the HBIM modelling and to create an immersive interactive environment (VR and AR) for different types of users (experts, non-experts and tourists) and devices (desktop, mobile, VR headset). Even if the process is not yet automatized, the possibility to have different models and data available within a virtual hub platform will open to the VR/AR/MR developers the possibility to enrich the narratives with validated research and related information.…”
Section: Related Work and Research Objectivesmentioning
confidence: 99%
“…Furthermore, the study of the vaulted system was performed to feed the GeoDB vault database, making the data (3D models, CAD drawings…) accessible by anyone at any given time (Brumana et al, 2019;Brumana et al, 2018c).…”
Section: The Barlonghe Vaults and The Stylistic Restoration In The 19mentioning
confidence: 99%
“…In Italy, due to its large amount of heritage assets and its tradition of safeguarding its monuments, various studies have been performed. At the Politécnico di Milano (POLIMI), the research group led by Raffaella Brumana [12] has extensive experience with HBIM and its integration in GIS for the conservation of parks and gardens. At the Università di Pisa, the research group led by Marco Bevilacqua [13] studied the integration of 3D models in geomatic systems regarding the conservation of cultural heritage.…”
Section: Introductionmentioning
confidence: 99%
“…The integration of these dimensions in HBIM process appears to be crucial as it addresses two major issues in the field of the heritage documentation. On the one hand, it limits the risks of data obsolescence by integrating all related data into the model for use in conjunction with the operation and maintenance phase of the life cycle of the properties, thus avoiding these data being stored in local databases [21]. On the other hand, it has been argued that the limited interactions among the different spheres of heritage conservation often results in a problematic disconnection between the initial phases of a project, such as the preliminary studies, and the actual interventions in the execution and maintenance phases [5].…”
Section: Introductionmentioning
confidence: 99%