2011 IEEE Symposium on Industrial Electronics and Applications 2011
DOI: 10.1109/isiea.2011.6108766
|View full text |Cite
|
Sign up to set email alerts
|

Transient stability analysis on Sarawak's Grid using Power System Simulator for Engineering (PSS/E)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
9
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 27 publications
(9 citation statements)
references
References 3 publications
0
9
0
Order By: Relevance
“…Numerical simulations were implemented on a modified New England 39-bus system with PSS/E [ 61 ] to simulate the data acquired by a WAMS and PMUs. To approximate the system behavior [ 27 ], the load levels of the power system were set to 50%, 51%, …, and 100% of the original load levels [ 32 ].…”
Section: Case Studiesmentioning
confidence: 99%
“…Numerical simulations were implemented on a modified New England 39-bus system with PSS/E [ 61 ] to simulate the data acquired by a WAMS and PMUs. To approximate the system behavior [ 27 ], the load levels of the power system were set to 50%, 51%, …, and 100% of the original load levels [ 32 ].…”
Section: Case Studiesmentioning
confidence: 99%
“…In this paper, PSS/E will be used for characterizes the power system transmission network and generation performance for both load flow analysis and transient analysis [5]. All the sources referred from the books, articles, research papers and journals.…”
Section: Introductionmentioning
confidence: 99%
“…To analyse a power grid from an electrical point of view, examine its stability and define the potential integration of DG into the grid, static and dynamic simulations need to be carried out [9]. Stability considerations can be divided into two case studies: the steady‐state and dynamic stability analyses.…”
Section: Introductionmentioning
confidence: 99%
“…The N − 1 criterion is that the system must withstand on its own a loss of any single element. That means that all the line flows must be below their limits not only for a given normal operating state, but also when any of the lines is disconnected [9, 10]. Short‐circuit calculations introduce the proper selection of HV equipment and protection relays.…”
Section: Introductionmentioning
confidence: 99%