2004
DOI: 10.1109/tpwrs.2003.821427
|View full text |Cite
|
Sign up to set email alerts
|

Transmission Loss Allocation in a Multiple-Transaction Framework

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2007
2007
2021
2021

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 34 publications
(16 citation statements)
references
References 17 publications
0
16
0
Order By: Relevance
“…(13) is suitably modified to incorporate transaction data so that the transmission losses may be allocated among individual transactions. Following the notations given in [9], transaction framework is set up as follows.…”
Section: Problem Formulationmentioning
confidence: 99%
See 2 more Smart Citations
“…(13) is suitably modified to incorporate transaction data so that the transmission losses may be allocated among individual transactions. Following the notations given in [9], transaction framework is set up as follows.…”
Section: Problem Formulationmentioning
confidence: 99%
“…A 3 bus example shown in the fig.2 with one multiple transaction set given in [9] is considered for the purpose of comparision. Line data and bus data is shown in the diagram.…”
Section: B Numerical Examplementioning
confidence: 99%
See 1 more Smart Citation
“…The amount of losses dependents mainly on the size of the country, the length of power lines, voltage of transmission and distribution, and quality of network (complexity, technology that is used, and the particular conditions that prevail in the various regions and countries). This impact in transactions is important and several schemes have been proposed so far for the allocation of losses [29][30][31][32][33].…”
Section: Transmission Lossesmentioning
confidence: 99%
“…In [25], an attempt is made that the difference between the sum of theoretically allocated losses and the actual system loss are reduced. In [26][27][28][29][30][31][32] the concept of distributed slack bus is introduced. In this method loses allocated to busses are exactly equal to actual loss which is given by ac power flow.…”
Section: Introductionmentioning
confidence: 99%