Proceedings of Production and Operations Symposium 2007
DOI: 10.2523/106756-ms
|View full text |Cite
|
Sign up to set email alerts
|

Use of a New Rate-Integral Productivity Index in Interpretation of Underbalanced Drilling Data for Reservoir Characterization

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractThe prospect of dynamic reservoir characterization using flow and pressure data gathered during underbalanced drilling (UBD) is a powerful driver for implementation of UBD. The mathematical aspects of this complex, ill-posed, inverse problem have been the subject of research in the past decade. This paper focuses on practical, field implementation of UBD reservoir characterization, and the problems that consequently arise. Interpretation of data from UBD is m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2007
2007
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 8 publications
0
5
0
Order By: Relevance
“…It is this data that is used in the advanced analysis stage to construct the RIPI plot. Further details on the subject are noted in the references [4][5] . The application and results of this process from our field case will be provided in depth in the following section.…”
Section: Real Time Reservoir Characterization (Rtrc) Process (Courtesmentioning
confidence: 99%
See 2 more Smart Citations
“…It is this data that is used in the advanced analysis stage to construct the RIPI plot. Further details on the subject are noted in the references [4][5] . The application and results of this process from our field case will be provided in depth in the following section.…”
Section: Real Time Reservoir Characterization (Rtrc) Process (Courtesmentioning
confidence: 99%
“…Several professionals investigated different methods to perform the analysis which are documented in the references [4][5][6] . The acquisition and interpretation of FWD data utilizing transient analysis techniques to estimate reservoir parameters play an integral role in enhancing the understanding of the dynamic nature of the reservoir.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The Rate-Integral Productivity Index (RIPI) approach described by Suryanarayana, et. Al 6 . was used to improve the ability to interpret UBD data.…”
Section: Application Of Ubd-rc In the Lisburne Ubd Projectmentioning
confidence: 99%
“…Automatic history matching for surface oil rate is implemented to compute permeability by the use of a bottom-hole pressure as a constraint. Suryanarayana et al 11 developed a practical procedure for data gathering and interpretation of the UBD data using a rate-integral well productivity index.…”
Section: Introductionmentioning
confidence: 99%