All Days 1999
DOI: 10.4043/10891-ms
|View full text |Cite
|
Sign up to set email alerts
|

Use of the Dual-Activity Drillship as a Field Development Tool

Abstract: The startup of the dual-activity drilling vessel Discoverer Enterprise in early 1999 heralds a new age for deepwater development. For the first time a drilling vessel exists that can perform many of the aspects of deepwater field development cost effectively, including a variety of subsea production equipment installations and flowline/pipeline laying. This capability minimizes the barges and equipment required for field development and yields schedule flexibility for the installation tasks. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2010
2010
2019
2019

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Therefore, it is necessary to establish a mechanical model of parallel strings firstly. When the parallel strings work together, the upper end of the riser and drilling string are connected to the drilling operation platform (Hall et al, 1999). Nevertheless, the lower end of the riser is suspended by the BOP, and the string is connected to the subsea wellhead.…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…Therefore, it is necessary to establish a mechanical model of parallel strings firstly. When the parallel strings work together, the upper end of the riser and drilling string are connected to the drilling operation platform (Hall et al, 1999). Nevertheless, the lower end of the riser is suspended by the BOP, and the string is connected to the subsea wellhead.…”
Section: Methodsmentioning
confidence: 99%
“…The essence of dual derrick drilling is to equip the derrick on the platform with two drilling rigs. One significant advantage identified is that the auxiliary rig is out of the critical path while drilling progresses with the main rig (Hall et al, 1999). Figure 1 shows one rig conducts all top holes operations, drilling, tripping, running pipe while the other is running the BOP and riser (Liu et al, 2017;Munch-Søegaard and Nergaard, 2001).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation