Using Piecewise Linearization Method to PCS Input/Output-Efficiency Curve for a Stand-Alone Microgrid Unit Commitment

Abstract: When operating a stand-alone micro grid, the battery energy storage system (BESS) and a diesel generator are key components needed in order to maintain demand-supply balance. Using Unit Commitment (UC) to calculate the optimal operation schedule of a BESS and diesel generator helps minimize the operation cost of the micro grid. While calculating the optimal operation schedule for the microgrid, it is important that it reflects the actual characteristics of the implanted devices, in order to increase the schedu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 22 publications
0
2
0
Order By: Relevance
“…The MILP method of calculation is assumed to be accurate for the grid operation issues in [25] and [26]. For applying scheduling problems to MILP, a piecewise linear technique is utilized to calculate diesel power generation cost.…”
Section: Formulation For Milp Of Conventional Microgrid Schedulingmentioning
confidence: 99%
“…The MILP method of calculation is assumed to be accurate for the grid operation issues in [25] and [26]. For applying scheduling problems to MILP, a piecewise linear technique is utilized to calculate diesel power generation cost.…”
Section: Formulation For Milp Of Conventional Microgrid Schedulingmentioning
confidence: 99%
“…By solving the optimization, the total day-ahead schedule data for the electric power import/export from/to the connected power system, input/output of the PCS and diesel generator, charge/discharge amount of BESS, and the electric power that critical and non-critical loads have absorbed, are obtained. The diesel generator fuel cost at time t and start-up cost is referred by [28].…”
Section: B Milp Optimization Formulationmentioning
confidence: 99%