2016
DOI: 10.25105/jti.v6i2.1543
|View full text |Cite
|
Sign up to set email alerts
|

Usulan Pengurangan Waktu Setup Menggunakan Metode Smed Serta Pengurangan Waktu Proses Produksi Dan Perakitan Menggunakan Metode Most Di Pt. Panasonic Manufacturing Indonesia

Abstract: <p>PT Panasonic Manufacturing Indonesia adalah perusahaan yang bergerak dalam bidang<br />manufaktur yang melakukan proses produksi dan perakitan produk. Sebagai perusahaan yang<br />melakukan proses produksi dan perakitan produk Air Conditioner, Air Conditioner Business Unit PT<br />Panasonic Manufacturing Indonesia seringkali terjadi permasalahan terkait pencapaian target harian<br />produksi untuk produk Air Conditioner Model CS-YN9RKJ. Identifikasi masalah dengan diagram<br… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0
1

Year Published

2022
2022
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
3
0
1
Order By: Relevance
“…Industrial development is entering a new era where companies are required to improve their performance to be able to compete in the global market (Fathia et al, 2016). One of them is the automotive manufacturing industry which produces automotive components.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Industrial development is entering a new era where companies are required to improve their performance to be able to compete in the global market (Fathia et al, 2016). One of them is the automotive manufacturing industry which produces automotive components.…”
Section: Introductionmentioning
confidence: 99%
“…Research (Hien N. Nguyen & Nhan H. Huynh, 2019) uses Single Minute Exchange of Dies (SMED) to reduce setup time in the assembly manufacturing industry. SMED has succeeded in reducing production losses in Industry A (Fathia et al, 2016). SMED is an improvement method from Lean Manufacturing that is used to speed up setup time or production changes (Ikatrinasari et al, 2018) (Sahin & Kologlu, 2022).…”
Section: Introductionmentioning
confidence: 99%
“…Bumi Trans Energi is a company engaged in 3 Kg LPG cylinder retested repair, this company repairs 3 Kg LPG cylinders that have been damaged for 5 years, damage to the handguard and footring, and welded joints on the tube. In the repair process [1]. there are 5 stations and 21 work processes, at station 1 (there are 8 work processes, namely removing the remaining gas in the tube using a purging gas machine, seeing tube leaks using the initial leak test machine, opening the valve using the open valve 1 engine [2].…”
Section: Introductionmentioning
confidence: 99%
“…Sedangkan pada penelitian Fathia dkk (2016) dengan menggunakan metode MOST didapatkan hasil dari usulan perbaikan menggunakan metode MOST diperoleh waktu proses pembuatan evaporator selama 1082.42 detik yaitu adanya pengurangan waktu sebanyak 19.47%. Sedangkan, waktu proses perakitan selama 393.27 detik yaitu adanya pengurangan waktu sebanyak 29% [4]. Selanjutnya penelitian oleh Khoir dkk (2021) menggunakan metode MTM-1 untuk perbaikan sistem kerja pada divisi Produk rack trolley didapatkan memperoleh hasil packing lead time kondisi awal adalah 43 menit, sedangkan waktu yang ada di video adalah 53 menit [6].…”
unclassified