2015
DOI: 10.17485/ijst/2015/v8i32/87285
|View full text |Cite
|
Sign up to set email alerts
|

Value Engineering in Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
12
0
3

Year Published

2018
2018
2022
2022

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 31 publications
(15 citation statements)
references
References 9 publications
0
12
0
3
Order By: Relevance
“…VM is a methodology that requires application of techniques that gear the possibility of achieving increased value for money. Ilayaraja and Eqyaabal (2015) described VM as a problem solving methodology that reduces cost and improves decision-making, leading to optimal expenditure of a client’s resources. The essentiality of adequate knowledge of VM technique such as lifecycle costing, creative thinking and FAST diagram in achieving the objective of undertaking VM was revealed by Ilayaraja and Eqyaabal (2015).…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…VM is a methodology that requires application of techniques that gear the possibility of achieving increased value for money. Ilayaraja and Eqyaabal (2015) described VM as a problem solving methodology that reduces cost and improves decision-making, leading to optimal expenditure of a client’s resources. The essentiality of adequate knowledge of VM technique such as lifecycle costing, creative thinking and FAST diagram in achieving the objective of undertaking VM was revealed by Ilayaraja and Eqyaabal (2015).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Ilayaraja and Eqyaabal (2015) described VM as a problem solving methodology that reduces cost and improves decision-making, leading to optimal expenditure of a client’s resources. The essentiality of adequate knowledge of VM technique such as lifecycle costing, creative thinking and FAST diagram in achieving the objective of undertaking VM was revealed by Ilayaraja and Eqyaabal (2015). Yu (2006) also noted that VM techniques are useful for construction project scope clarification.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Various researchers conducted numerous works on different places, such as Rachwan et al 24 , Ilayaraja and Eqyaabal 25 , Yan 26 , and so on for investigating and evaluating the effectiveness and importance of Value Engineering methodology for various disciplines. The benefit of VE was observed to be significantly greater when interdisciplinary engineering teams were included, which would also impact the design team, as is typical in the building.…”
Section: Introductionmentioning
confidence: 99%
“…The value in the cooling medium is used to present strategies that can be applied to solve problems related to minimizing cooling process costs while maintaining the quality of products steel ST 41 to its function [3]. This research is a value engineering method on steel ST 41 research, this is a reference to reduce unnecessary costs when cooling from heat treatment results by comparing initial alternatives and proposals based on price variants [4]. The reason for using this research method is the ability of value engineering to control unnecessary costs and keep costs to a minimum while maintaining quality as needed, in a structured manner providing good functional value.…”
Section: Introductionmentioning
confidence: 99%