2022
DOI: 10.1016/j.jobe.2021.103703
|View full text |Cite
|
Sign up to set email alerts
|

Verifying of the feasibility and energy efficiency of the largest certified passive house office building in China: A three-year performance monitoring study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(9 citation statements)
references
References 26 publications
0
9
0
Order By: Relevance
“…The Passive House Technique and Experience Centre (PHTEC) building, 47 is a PHI-certified building located in the Sino-German Ecopark in Qingdao, China (Figure 2). Qingdao is located at 36°4 0 N, 120°19 0 E, on the coast of the Yellow Sea.…”
Section: Building Descriptionmentioning
confidence: 99%
“…The Passive House Technique and Experience Centre (PHTEC) building, 47 is a PHI-certified building located in the Sino-German Ecopark in Qingdao, China (Figure 2). Qingdao is located at 36°4 0 N, 120°19 0 E, on the coast of the Yellow Sea.…”
Section: Building Descriptionmentioning
confidence: 99%
“…The monitoring system of Testbed EM logs indoor temperature, CO 2 concentration, electricity use and domestic hot water use in all 305 apartments with a sample rate of 1 min. An indicator, called Missed Data Points Ratio (MDPR), was defined as the available number of measurements over the expected number of measurements based on the sample rate of 1 min to quantify the data availability over the 12-month period of analysis (Equation (1)). An MDPR of 100% would indicate that all measurements are available as expected.…”
Section: Data Quantitymentioning
confidence: 99%
“…Smart buildings typically deploy, among others, more advanced sensor capabilities and advanced monitoring systems. Data from monitoring systems has for instance been used to monitor the energy performance of buildings during operation [1][2][3], to highlight significant energy performance gaps and to identify the reasons for these discrepancies between expected energy use from design and actual monitored energy use, [4][5][6].…”
Section: Introductionmentioning
confidence: 99%
“…The impact of occupancy on the building cooling load is mostly related to the use of appliances. Since the room is designed for a specific number of people and appropriate activities to be performed within it, overheating can sometimes occur when we move away from the designed specifications [6][7][8][9], and affect the indoor comfort. The cooling within the building can be improved by the choice of material with excellent thermal inertia [6] that will impact on the radiant time series factors of the cooling load model of the building.…”
Section: Introductionmentioning
confidence: 99%
“…Since the room is designed for a specific number of people and appropriate activities to be performed within it, overheating can sometimes occur when we move away from the designed specifications [6][7][8][9], and affect the indoor comfort. The cooling within the building can be improved by the choice of material with excellent thermal inertia [6] that will impact on the radiant time series factors of the cooling load model of the building. Avoiding overcooling and maintaining the best thermal comfort [10] are the main goals of the heating, ventilation, and air conditioning (HVAC) system in the building.…”
Section: Introductionmentioning
confidence: 99%