“…The environmental conditions that usually hinder the majority of the offshore operations concern stochastic variables such as wind speed, wave height and wave period. The wind and wave influence on the uncertainty of the operational window (i.e., the period in which offshore works can be executed) is a well-known problem and has been extensively studied for installation and maintenance activities of offshore wind farms (Stålhane, Vefsnmo, Halvorsen-Weare, Hvattum, & Nonås, 2016;Kikuchi et al, 2009;Martin, Lazakis, Barbouchi, & Johanning, 2015;Leontaris, Morales-Nápoles, & Wolfert, 2016). Probabilistic models have been developed to cope with uncertainties of the duration of the operational windows and its effect on offshore infrastructural assets planning (time and costs).…”