2013
DOI: 10.1016/j.procir.2013.06.172
|View full text |Cite
|
Sign up to set email alerts
|

Volume and Mix Flexibility Evaluation of Lean Production Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 14 publications
(10 citation statements)
references
References 16 publications
0
10
0
Order By: Relevance
“…The present work focuses on two types of flexibility that are commonly deemed the most important (Hallgren & Olhager, 2009;Metternich et al, 2013):…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…The present work focuses on two types of flexibility that are commonly deemed the most important (Hallgren & Olhager, 2009;Metternich et al, 2013):…”
Section: Discussionmentioning
confidence: 99%
“…In this study, we simplify the model from Suarez, Cusumano, and Fine (Suarez, Cusumano & Fine, 1996), and focus on Volume Flexibility (hereafter VOLF) and Mix Flexibility (hereafter MIXF), that drive most of the overall MF (Hallgren & Olhager, 2009;Metternich, Böllhoff, Seifermann & Beck, 2013 proper definition of these indicators, the following parameters must be defined: CPL is the Current Production Level that the system is required to produce, namely the number of batches produced each day; MPC is the Maximum Productive Capacity that a given system arrangement can achieve assuming a random productive sequence; QIP is the average Quantity of Identical Products' batches manufactured in series during the process.…”
Section: Predicted Performancesmentioning
confidence: 99%
“…In a perfectly lean and flexible production system, the lead time between customer demand and delivery would be zero. To quantitatively evaluate the maturity level of the flexibility principle, see Formula (1) from [48] for a mathematical definition in which the ratio of the deviation and the total demand were weighted by the capacity demand (more details in Section 2.3.1).…”
Section: P3 Flexibilitymentioning
confidence: 99%
“…Ahmad et al, 2012Atmaca and Girenes, 2013Cuatrecasas-Arbos et al, 2011Bakri et al, 2012Behrouzi and Wong., 2011Bortolotti et al, 2015Chavez et al, 2015Deif, 2012Dombrowski et al, 2012Dominici and Palumbo, 2012Eroglu and Hofer, 2011Fullerton et al, 2013Gligor et al, 2015Gnogni et al, 2013Hofer et al, 2012Holtskog, 2013 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Johnstone Krogstie and Martinsen, 2013Metternich et al, 2013Al-Tahat and Jalham, 2015Nasab et al, 2012Netland et al, 2015Pamfilie et al, 2012Peter and Lanza, 2011Purvis et al, 2014Rahani and al-Ashraf, 2012Ravet, 2011Schwarz et al, 2011Fagerlind Stahl et al, 2015Turner and Lane, 2013Tyagi et al, 2015Wasim et al, 2013 2011 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 ...…”
Section: Lean Managementmentioning
confidence: 99%