2017
DOI: 10.1109/tpwrs.2016.2603225
|View full text |Cite
|
Sign up to set email alerts
|

Wind Power Providing Flexible Ramp Product

Abstract: Abstract-The deepening penetration of renewables in power systems has contributed to the increasing needs for generation scheduling flexibility. Specifically, for short-term operations, flexibility here indicates that sufficient ramp capacities should be reserved to respond to the expected changes in the load and intermittent generation, also covering a certain amount of their uncertainty. To address the growing requirements for flexible ramp capacity, markets for ramp products have been launched in practice s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
47
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 99 publications
(47 citation statements)
references
References 37 publications
(19 reference statements)
0
47
0
Order By: Relevance
“…The system-level ramp capability requirements are set for both upward and downward directions for each interval in RT dispatch and can vary between different intervals, as shown in Figure 2a. Note that in t 5 , there is only requirement for upward FRP because the net load is expected to increase steeply in this period and no downward FRP is needed. In contrast, only requirement for downward FRP is needed in t 2 and for other intervals such as t 1 and t 4 , FRPs for both directions are required.…”
Section: Flexible Ramping Productmentioning
confidence: 99%
See 3 more Smart Citations
“…The system-level ramp capability requirements are set for both upward and downward directions for each interval in RT dispatch and can vary between different intervals, as shown in Figure 2a. Note that in t 5 , there is only requirement for upward FRP because the net load is expected to increase steeply in this period and no downward FRP is needed. In contrast, only requirement for downward FRP is needed in t 2 and for other intervals such as t 1 and t 4 , FRPs for both directions are required.…”
Section: Flexible Ramping Productmentioning
confidence: 99%
“…The general UC constraints include unit ramping up/down limits, unit generation limits, the maximum limits on base load shedding and RES output curtailment, and power balance constraint [5,25]. The FRP-related constraints reflect the system-wide ramp capability requirement, the impacts of FRP on unit generation and the maximum limits on interruptible load shedding.…”
Section: Stochastic Rtuc Considering System Ramping Requirement and Imentioning
confidence: 99%
See 2 more Smart Citations
“…Their results illustrate how "flexiramp" can improve system flexibility and market efficiency. Chen, R., et al [19] explored the mechanism and possibility of including wind power producers (WPPs) as ramping capacity providers. In [20], the impacts of ramping services on the thermal generation scheduling which include hourly demand response in the deregulated environment were addressed.…”
Section: Introductionmentioning
confidence: 99%