Many drilling and oil companies are facing tight budgets, and a promising option for survival is to optimally revisit the drilling plans and production operations. Although there are some options for this task in the current reservoir simulators, more in-depth analysis is indeed required. Hence, in this study we borrow the flexibilities and capabilities of both modeling and a reservoir simulator to spatiotemporally plan the drillings of new injector and/or producer wells, determine the total number of new wells, and schedule the production/injection from all wells. The entire approach is both mathematically enriched and simple to use in the industry. We show that our methodology outperforms the decisions of an industrially accepted reservoir simulator in two separate examples by 4.4% and 2.4%, respectively.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.