Purpose.Determination of the rock stability along the strike of the mass, where the drift mining of the horizon -480 m is conducted, considering the possibility of using the improved types of supports in the conditions of the 10th Anniversary of Kazakhstan’s Independence mine at the Khromtau field with the substantiation of using the effective type of fastening that increases technical and technological, operational and economic indicators of the mine. Methods. Numerical modelling of the stress-strain state of the rock mass applied at the mine have been performed using the RS2 software in a two-dimensional formulation. The rock mass state, as well as the physical-mechanical properties of mine rocks are determined according to building codes and regulations (SNiP II-94-80), depending on the category of the rock stability. Findings. It has been revealed that the combined supports from rock bolts and shotcrete are the most rational type of fastening in the studied mine. The efficiency and prospects of using the combined supports have been determined, which ensure a decrease in their material consumption and cost while increasing the reliability of mine workings and the labor productivity of miners. The use of combined support allows to increase the economy of materials for support by 1.7 times, as well as to increase the drifting rate by 1.6 times in comparison with the metal support. Originality.The paper proposes a new approach to substantiation of an effective fastening method by comparing the costs when driving horizontal underground mine workings in the mining-and-geological conditions of the 10th Anniversary of Kazakhstan’s Independence mine. Practical implications.The research results can be used when planning mining operations, in particular, stable fastening methods at the 10th Anniversary of Kazakhstan’s Independence mine of the Khromtay deposit, as well as other mining enterprises with similar mining-and-geological conditions.
Purpose. Determining the actual dimensions of the protecting and crown pillars of ore bodies by seismic survey and assessing the possibility of rock mass collapse and fracturing at the lower levels of the Zhairemskoye field. Methods. An integrated approach is used, which involves the analysis of complete ore bodies development during the combined mining. To determine the geological strength index (GSI) and rock mass rating (RMR), the mass structure is studied, as well as the survey is executed of rock fracturing on the contours of mine workings at levels of +288, +240, +192, +144 m. In addition, the physical and mechanical properties of rocks are refined using the RocLab software. Using the numerical modelling of the self-caving process, when mining the protecting and crown pillars, the processed results of numerical modelling are analysed and the possible zones of the mass deformation are assessed based on the Phase2 software. Findings. It has been determined that during the mining of ore bodies 4 and 6, protecting pillars between the quarry and the underground mine, crown pillars between the levels up to the level of +144 m, the rock displacements are possible along glide surfaces. It has been revealed that the haulage workings of levels +240 and +192 m fall into the zone of possible displacements influence, and the rock pillar between ore bodies 4 and 6 will be exposed to inelastic deformations during the mining of crown pillars to the level of +144 m. It has been found that after the crown pillar development between the levels of +240 and +192 m for ore body 6, the rock pillar destructions are possible between ore bodies 4 and 6, since during the modelling, displacements of more than 2 mm are observed. In this case, the destruction processes are possible in the rock pillar upper part. Originality.A geomechanical assessment of the rocks tendency to caving is given and problem areas of stability during the mining of ore bodies 4 and 6 in the Zhairemskoye field are identified. Practical implications. The stable parameters of protecting and crown pillars have been substantiated, which is an important aspect in the design/efficient technology of mining the contiguous ore bodies. Keywords: engineering seismic, ore body, pillar, level, iron, manganese
Cтатья посвящена определению оптимальной формы сечения горных выработок в соответствии с рейтинговыми классификациями в условиях Карагандинского угольного бассейна Республики Казахстан. Проведены исследования по подготовке исходных данных для исследования по установке припочвенных законтурных анкеров на шахте «Казахстанская». Проведены натурные наблюдения и исследования по смещению и пучению контура сечения горных выработок при установке припочвенных законтурных анкеров на шахте «Казахстанская»
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.