The fields operated by Esso Exploration and Production Chad Inc. (EEPCI) in a consortium project with PETRONAS and Chevron in Central Africa, target highly unconsolidated sandstone formations. Sand control equipment must be utilized to prevent production of sand resulting in failure of downhole and surface equipment. Screens can erode as a result of "hot spots" where fluid velocities have increased considerably, allowing sand entry into the wellbore causing the subsurface equipment to fail and decrease production. With high drilling costs, and the limited amount of surface space, it has become critical to repair the more prolific of these damaged wells. This paper provides an overview of the development and utilization of various failed sand control equipment removal and replacement techniques for workovers. Screen removal poses challenges not typically encountered when pulling other bottom hole assemblies from the well. The team has utilized existing available equipment and modified tools to address these unique challenges during workover operations. Initial attempts to pull sand control equipment required weeks of rig time and met with limited success. Packer release tools were not always effective, and milling over these packers proved problematic. Additionally, long screen sections were difficult to pull. Learnings from each workover operation were incorporated until the optimum methods were eventually identified. Also, tools were modified resulting in time and cost efficiencies. Additionally, a systematic approach of selecting the best candidates for repair was developed, taking into account various wellbore complexities such as age, type of completion, length of the bottom hole assembly, among others. Each complexity is weighted based on previous pulling experiences as well as taking into consideration the total volume of oil to return to production. Since June 2009, 15 gravel pack failures were repaired, and wells returned to production utilizing these evolving and improving techniques. This represents over 5,300' of pulled screens. The first successful repair (June, 2009) required 20 days to complete. Applying learnings and improved techniques, the average repair time has decreased to 9.5 days (one at 6 days), with an average 40% of cost reduction; 60% to 70% less than the cost of a new drillwell.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.