This value is greater than the value of compressive strength targeted based on the calculation of job mix design, in which it is 25 MPa. Conversion of Age and Compressive Strength Characteristics for the 5 (five) brands of PCC cement.
Steel twist is often happened on machine component that is the axis that its main function to continue power and circle. So, the choosing of axis substance that will be used is very important to know the strength of its twist, so it is safe to be used. This research is the research continuation that is has ever done before. Steel as technical material is often used as machine components, the strength to the external load is very needed to be known before it is used. The external load that is often happened to the machine component is twist load, pull load, bend load, and pound load. This research analyze the standard steel twist St.42 after it is heated at 800'C temperature with quick cooling, using plain water that is done in material test laboratory, majors in Machine Technical, Bali State Polytechnic. The research is aimed to get how big is the St.42 steel strength changes and its twist angle changes after being heated until 800'C and being quick cooled by using plain water, infact it becomes more tough and becomes more twist endure compared to standard St.42 steel. Its strength changes shows there is twist strength improvement until 38, 549%, that is from 503,7021855 (N/mm2) becomes 697,8735409(N/mm2), thus the steel angle arises, even the specific twist angle arises from 0,959385993 ('/mm) becomes 9.403372244('/mm)..
The complexity of the project expands along with the progress of human civilization. The problems that appear will be more numerous and complicated. The role of project management is indispensable in order to address and prevent these problems, so that the cost,the quality and the time agreed upon can be realized. Cost and time relationship is not directly proportional, so it is necessary to determine the optimal time by optimum cost. Optimization is a best effort undertaken by planning various alternative methods of implementation, in order to obtain optimal timing of projects with optimum cost. Planning and scheduling are the backbone of the entire project, which is based on clear objectives. Microsoft Project as one of the scheduling software based on Precedence Diagram Method (PDM) provides many advantages, one of which scheduling can be done more quickly and thoroughly.In this research, it is created six alternative models as follows: In the first alternative ,it is acquired the project period of 256 days , at a
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.