Abstract this paper concern about design ACOS with PLC system. The supply of electricity will move from the main generator to the battery when the main generator lost one phase, and the power supply will switch to the emergency generator when the voltage in accordance with the emergency generator working voltage AC electrical equipment on board is 380VAC. Electricity supply shall not move directly from the emergency generator to the main generator but to the battery first to prevent damage to the AC electrical equipment on board. Transport time for the system for 30 seconds ACOS equipment in accordance with the ICC and SOLAS regulations which require the transfer of under 45 seconds. ACOS equipment can be used in real conditions on the ship because it has phase failure, under voltage and over voltage protection and a relay as an indication for the transfer of command power supply automatically.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.