Taking into account moisture migration and heat change during the soil freezing process, as well as the influence of absolute porosity reduction on seepage during the freezing process, we construct a numerical model of hydrothermal coupling using laws of conservation of energy and mass. The model is verified by the results of large-scale laboratory tests. By applying the numerical calculation model to the formation of artificial shaft freezing temperature fields under the action of large-flow groundwater, we conclude that groundwater with flow rates of less than 5 m/d will not have a significant impact on the artificial freezing temperature field. The maximum flow rates that can be handled by single-row freezing pipes and double-row freezing pipes are 10 m/d and 20 m/d, respectively, during the process of freezing shaft sinking. By analyzing the variation of groundwater flow rate during freezing process, we find that the groundwater flow velocity can reach 5–7 times the initial flow velocity near the closure moment of the frozen wall. Finally, in light of the action characteristics of groundwater on the freezing temperature field, we make suggestions for optimal pipe and row spacing in freezing pipe arrangement.
The construction of shield tunnels inevitably causes displacement of the surrounding soil and additional stress and deformation of the buried pipeline. An energy solution for predicting the deformation of buried pipelines caused by tunneling is proposed in this study. First, based on the uniform ground movement model, the interval of the free displacement field of soil around the pipeline induced by tunneling is calculated. Then, we use the Pasternak model to establish the total potential energy equation of the tunnel-soil-pipeline interaction. The final settlement interval of the pipeline is obtained by solving the numerical calculation program with MATLAB. The calculation results of the energy solution are compared with the results of the centrifugal test and the reported theoretical solutions of Winkler and Pasternak, and then the applicability of the solution for predicting the pipeline response under different geotechnical conditions is verified. Combined with an engineering case, the energy method calculation results, numerical simulation results, and measured results are compared to obtain the most unfavorable position of the pipeline caused by tunneling. At the end of this study, the application steps of the proposed method in actual construction are summarized. These steps are used to predict pipeline response in order to take protective measures.
Tunnel Boring Machines (TBMs) are a cutting-edge excavating equipment, but are barely applied in underground coal mines. For TBM excavation projects involving the Zhangji coal mine, the surrounding rock properties, stress field, cross section geometry, as well as the excavation-induced stress path of TBM-excavated coal mine roadways are different from those of traditional tunnels or roadways. Consequently, traditional roadway supporting technologies and experiences cannot be relied on for this project. In order to research an appropriate supporting pattern for a TBM-excavated coal mine roadway, first of all, the constitutive model of roadway surrounding rocks was derived, and a rock failure criterion was proposed based on rock mechanical tests. Secondly, a three-dimension finite element model was established and computer simulations under three different supporting patterns were conducted. Stress redistribution, roadway convergence, and excavation damage zone ranges of surrounding rocks under three different support patterns were analyzed and an optimal support design of the TBM-excavated roadway was made based on simulation results. During roadway excavation, convergence gauge and rock bolt dynamometers were installed for monitoring roadway convergence and the axial forces of rock bolts. The in-situ monitoring results verified the validity of roadway supporting designs.
The penetration paths of grouts in sand layers are tortuous, and there is no reasonable penetration grouting theory at present. By employing tortuous circular tubes as the internal penetration pore channels of the sand layer, the cylindrical diffusion model is established for sand-layer penetration grouting. First, the permeability of porous media and average penetration velocity of Bingham slurry were deduced by considering tortuosity. Second, based on the penetration continuity equation, the active steady-state penetration differential equation of Bingham slurry and the pressure distribution function of slurry in the diffusion region were obtained. Finally, combined with the indoor penetration grouting test results, the attenuation law of slurry pressure and the influencing factors of diffusion radius were discussed. The results show that the cylindrical diffusion model of tortuous tubes can better characterize the diffusion process of penetration grouting in the sand layer. The stop condition for diffusion during penetration grouting is the reduction of the pressure gradient of the slurry to its starting value. The slurry pressure attenuation has obvious stages. The slurry pressure attenuation is faster in the area close to the grouting tube. At 50% of the maximum diffusion radius, the pressure attenuation is 70.01~75.41% of the total pressure attenuation within the diffusion region. Increasing the grouting pressure and permeability coefficient and reducing the slurry viscosity ratio can greatly increase the slurry diffusion radius. These results provide a theoretical basis for determining sand grouting parameters in the future.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.