In Samarang oil platform of Repsol (Talisman) Malaysia Limited, there is a need to increase its current oil production that would result in an increase of the associated/excess gas from 21 mmscfd to 31 mmscfd. The current low-pressure gas system on the platform is designed to accommodate up to 21 mmscfd of gas. The excess produced gas of 10 mmscfd, if not re-injected back into the reservoir, shall need to be flared on a daily basis in order to maximise the oil production rate. This gas flaring expends large amounts of energy and causes environmental degradation and potential health risk. There are four practical cases being considered in this unprecedented effort to control the flared gas and its resulting emissions from the industrially practical standpoint. Three cases use the existing compressor and varying compressor suction pressure between 5 barg and 6 barg with total compressors power is limited up to 2280 kW. The flared gas emission for these cases ranges from 7 mmscfd to 1 mmscfd, which is lower than the expected flowrate of 10 mmscfd. In the case where a new compressor is installed, a zero flared rate is achieved.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.