A production process whose performance deteriorates over time is studied in this paper. It is assumed that the process performance can be measured in terms of the proportion of good units of end items produced. Using the pontryagin principle, the optimal scheduled production rate and preventive maintenance rate will be derived as a function of both production rate and proportion of good units. The controlled system can be modeled by a system of non-linear differential equations and its solution will be discussed numerically. The sensitivity analysis for varying system parameters will be discussed for different cases of demand rate.
This paper studied a continuous-time model of a production maintenance system in which a manufacturing firm produces a single product selling some and stocking the remaining. The problem of adaptive control of a production-maintenance system with unknown deterioration has been presented. Using Liapunov technique, the production rate and updating rule of deterioration rate are derived as non-linear functions of inventory level perturbation. Numerical analysis for the system has been presented for a set of parameter values and demand rate.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.