For the period 1975-2016, this paper examines the determinants of the residential demand for electricity in South Africa including disposable income, electricity prices, food prices as well as the impact of the 2007/08 load-shedding wave and the 2008 electricity price restructuring. Given the high income inequality levels in South Africa, this relationship was investigated at aggregated and disaggregated income levels. Based on an Autoregressive Distributed Lag (ARDL) model, the empirical results indicate long-run cointegration between residential electricity consumption, gross national disposable income, electricity prices and food prices. Disposable income elasticities have a positive sign for the aggregate and all income groups, indicating that as income increases, South African households consume more electricity (normal good). As expected, price elasticities are negative and significant-for both the aggregated and disaggregated models-indicating that electricity prices do influence electricity demand for all South African households. The paper also examines the complementarity or substitutability of food and electricity. At both the aggregated and disaggregated income levels, the results showed that food and electricity are substitute goods for all South African households. However, as expected, the magnitude of this relationship is marginally different for each income group.
This paper investigates the role that the building of two new power stations, Medupi and Kusile, will play in facilitating future economic activity in South Africa. We use a dynamic computable general equilibrium (CGE) model to estimate the economy-wide effects of these new power stations. Our simulation results also provide insight into how much the local economy has lost due to inadequate electricity supply in the period leading up to the construction of Medupi and Kusile. We find that the decision to build additional power generation capacity was necessary and justified, and that the failure to sooner recognise the need for expansion of the country's electricity generation capacity and subsequent delays in commissioning Medupi and Kusile, likely cost the economy over R110bn in lost production. Additional analysis, in which a further two-year delay in the construction of Medupi and Kusile is simulated, shows that such an event will cause the economy to perform below baseline projections up to 2022.JEL Codes: C68, Q41, Q43
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.