We propose a Standard Time (ST) Estimate Model based on energy demand to attain more equal work distribution in manual assembly lines. The proposal was developed estimating the energy consumption by monitoring the heart rate (HR) of 84 people between 18 and 48 years old while performing repetitive activities under moderate workload (2.5–5.0 kilocalories/minute (Kcal/min)). Variables on one model were determined, which were based on energy consumption (EC) using the 13-variable Best-Subset function. Subsequently, a general equation for the Standard Time (ST) Estimate Model was calculated through lineal regression. Two significant variables were obtained: total kilocalories (Kcal tot.)/pieces and total Kcal/operation time (OT) for each station, which are included in a Standard Time Estimate Model. ST can be represented with a regression model measuring the total number of kilocalories consumed by workers and the OT, which can help companies to balance the cycle time in their assembly lines.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.