Foundation problems during building construction may cause important structural and nonstructural damage, and compromise the building serviceability. This paper presents a case study of a jackassisted leveling process implemented on a 17-story reinforced concrete building that suffered important differential settlements during its construction. It is the first time a leveling solution for just a group of piles is implemented, since previous studies considered intervening all foundation piles. The procedure consists on cutting a small slice of the piles in the unsettled side of the building, equivalent to the necessary descent for leveling the settlements in the opposite end, and lowering the unsettled part by a controlled maneuver with hydraulic jacks. Prior to its execution, a numerical model was developed for predicting the effectiveness of the descent maneuver indicating that the leveling process would correct the tilt of the building. The solution was successfully implemented and the building is now in service.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.