A major operator in onshore Middle East was planning to conduct a water shutoff intervention in an oil producer with very high water cut and a naturally fractured carbonate reservoir. The well was completed horizontal with 18 inflow control device (ICD) elements and 16 swell packers along the production liner and openhole section. The production tubing had an electrical submersible pump (ESP) and Y-tool to allow access to the horizontal section. Due to the complexity of the completion and limited access to the reservoir, an engineered approach combining a precise placement method with a reliable water conformance chemistry was necessary. The engineered approach relied on the use of coiled tubing (CT) equipped with real-time downhole measurements, high-pressure rotary jetting tool, backpressure valve, and through-tubing inflatable packer. Downhole readings included CT internal pressure, annulus pressure, annulus temperature, and casing collar locator (CCL). They were used both to achieve optimum use of the rest of the bottomhole assembly during the intervention, and to evaluate treatment effectiveness. The selected water conformance fluid system combined a medium-molecular-weight polyacrylamide crosslinked gel for fissure plugging with a nanoparticulate leak off control additive to keep most of the polyacrylamide gel within the fissure network. In horizontal wells, critical steps for water shutoff, such as proper wellbore conditioning, accurate placement technique and controlled fluid penetration, cannot be accomplished through conventional methods, especially in completions with flow control components, and innovative methodologies are required for efficient intervention. An evolved approach for water shutoff intervention relying on real-time downhole data was implemented for the first time in this field, reducing water production from 1300 B/D to 400 B/D, while increasing oil production from 180 B/D to 350 B/D. In the first run, high-pressure rotary jetting tool was used to condition the wellbore tubulars across the inflatable packer planned anchoring depth. In the second run, the through-tubing inflatable packer was set at the target depth, and the water shutoff treatment was pumped into the formation across the target ICDs. CT real-time downhole measurements were instrumental for accurate depth correlation, ensure optimum differential pressure across the high-pressure jetting tool, to control inflation and anchoring of the through-tubing inflatable packer, and to monitor the water shutoff treatment. This engineered approach, which leverages the use of real-time downhole data to accurately control the positioning and actuation of high-pressure jetting tools and through-tubing inflatable packers, enables critical interactions with formation and completion. This level of control is critical in water shutoff operations, for it enables the customization of original designs based on the changing downhole conditions to achieve maximum effectiveness of the sealing fluids.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.