The purpose of the research was to study the structure of MPG-7 fine-grained graphite by X-ray inspection and scanning electron microscope investigation methods. We carried out a structural and local chemical analysis of inhomogeneities occurring in graphite blanks. According to the data obtained, we changed technical documentation for the incoming quality control of MPG-7 graphite blanks and details.
One of the key uncertainties associated with miscible water-alternating-gas (WAG) projects is the well injectivity. The underestimation of productivity indexes of the injectors always results in the loss of additional oil production. This paper describes the current solutions and approaches to the design and implementation of nitrogen injection pilot into the injection well on the remote oil field in order to adjust the technical and economic indicators of miscible WAG process.
First of all, according to the probability distribution of permeability on the field, the well selection process was carried out. At the second stage, due to the high capital costs of pipeline construction, a gaseous agent(nitrogen) that may be transported in the liquid form was selected. Then, for each well, based on the simulation models, the required nitrogen resources were estimated to ensure that the steady-state flow was achieved. The final stage of pilot works design includes the selection of the measuring instruments to record injection rates, pressures (BHP, THP), temperatures in the well and production logging.
The main result of the pilot injection of the nitrogen into the reservoir was the confirmation of the key success criteria: productivity indexes and gas injectivities, tightness of the cement in the wells and the possibility of displacing the water from the wellbore to the reservoir at the current tubing head pressure. During the analysis of the results, the simulation model which were designed to calculate the predicted effects of the implementation of the miscible WAG on the field were adjusted to match pilot tests results. Application of the results of pilot injection allowed to increase a duration of the water injection cycles without loss of the gas injection volumes and gas utilization levels. The duration change in the operating cycles of the WAG, in turn, makes it possible to increase the displacement efficiency, which leads to an increase of the cumulative oil production by 10%.
Based on the key uncertainty management studies: laboratory studies to study the processes of oil and gas interaction (slim-tube test, asphaltenes precipitation test), special core analysis, pilot gas injection and economical evaluation, a decision was made to launch a miscible WAG project in the oil field.
In this paper, it is shown that the implementation of a nitrogen injection pilot allows us to reduce the uncertainties in injectivity for wells originally constructed not for gas injection. Correct analysis of the results gives a deeper understanding of the processes occurring in the injection wells during the transition period from water to gas injection. This field test of nitrogen injectivity gives a good opportunity for the full filed WAG project implementation.
Разработана методика радиографического контроля углерод-углеродных композиционных материалов, в которой оптимизированы следующие параметры: чувствительность, контрастность и геометрия просвечивания. Вероятность выявления объемных дефектов по разработанной методике составляет 98 %.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.