Bellwether effect refers to the existence of exemplary projects (called the Bellwether) within a historical dataset to be used for improved prediction performance. Recent studies have shown an implicit assumption of using recently completed projects (referred to as moving window) for improved prediction accuracy. In this paper, we investigate the Bellwether effect on software effort estimation accuracy using moving windows. The existence of the Bellwether was empirically proven based on six postulations. We apply statistical stratification and Markov chain methodology to select the Bellwether moving window. The resulting Bellwether moving window is used to predict the software effort of a new project. Empirical results show that Bellwether effect exist in chronological datasets with a set of exemplary and recently completed projects representing the Bellwether moving window. Result from this study has shown that the use of Bellwether moving window with the Gaussian weighting function significantly improve the prediction accuracy.
Context: In addressing how best to estimate how much effort is required to develop software, a recent study found that using exemplary and recently completed projects [forming Bellwether moving windows (BMW)] in software effort prediction (SEP) models leads to relatively improved accuracy. More studies need to be conducted to determine whether the BMW yields improved accuracy in general, since different sizing and aging parameters of the BMW are known to affect accuracy. Objective: To investigate the existence of exemplary projects (Bellwethers) with defined window size and age parameters, and whether their use in SEP improves prediction accuracy. Method: We empirically investigate the moving window assumption based on the theory that the prediction outcome of a future event depends on the outcomes of prior events. Sampling of Bellwethers was undertaken using three introduced Bellwether methods (SSPM, SysSam, and RandSam). The ergodic Markov chain was used to determine the stationarity of the Bell-wethers. Results: Empirical results show that 1) Bellwethers exist in SEP and 2) the BMW has an approximate size of 50 to 80 exemplary projects that should not be more than 2 years old relative to the new projects to be estimated. Conclusion: The study's results add further weight to the recommended use of Bellwethers for improved prediction accuracy in SEP.
Abstract-Software Testing Effort (STE), which contributes about 25-40% of the total development effort, plays a significant role in software development. In addressing the issues faced by companies in finding relevant datasets for STE estimation modeling prior to development, cross-company modeling could be leveraged. The study aims at assessing the effectiveness of cross-company (CC) and within-company (WC) projects in STE estimation. A robust multi-objective Mixed-Integer Linear Programming (MILP) optimization framework for the selection of CC and WC projects was constructed and estimation of STE was done using Deep Neural Networks. Results from our study indicate that the application of the MILP framework yielded similar results for both WC and CC modeling. The modeling framework will serve as a foundation to assist in STE estimation prior to the development of new a software project.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.