At Hamburg University of Technology the combination of an open cycle desiccant-assisted air conditioning system and a geothermal system is investigated in the framework of different research projects for several years. The objective of this study is to investigate the energy efficiency of the overall system and to evaluate the geothermal system during summer and winter mode, based on data measured for a temperate climate region. Monitoring results of the performance for dehumidification and remoistening of supply air are presented. Furthermore, the investigated system is compared to reference air conditioning processes. During summer mode, an average dehumidification efficiency of 1.15 is achieved. The electrical energy savings compared to a conventional reference system sum up to 50% for the investigated cooling period. System operation during winter shows an average moisture recovery efficiency of 0.75. The electrical energy demand for air humidification is reduced by 50% compared to a system with electric isothermal air humidification. The geothermal system is operated efficiently throughout the year for cooling and heating application. Besides the energetic system evaluation, measured data regarding the soil temperature and thermal comfort are presented.
The objective of this work is to analyze a gas injection borehole heat exchanger coupled with a desiccant assisted air conditioning system during cooling and heating operation. A common problem that occurs in air conditioning systems is peak loads, during which the cooling or heating power of the soil can be exceeded. To counteract this drawback, a gas injection borehole heat exchanger, which is capable of creating artificial groundwater flow along the heat exchanger by inducing a pressure difference inside the well, is used. Experimental results of the performance differences between a conventional and a gas injection borehole heat exchanger are presented. Under the same inlet conditions, a reduction in the outlet temperature of up to 2 °C is achieved compared with an equivalent conventional borehole heat exchanger in cooling mode. The maximum cooling power is increased by 26%. As a result, a fast and dynamic responding control of the heat transfer between the heat exchanger and the soil is possible. During winter operation, despite the lower drilling depth of the gas injection borehole heat exchanger system, the performance is within the range of a conventional system. The power increase is limited to around at a steady state. In conclusion, gas injection borehole heat exchangers can be promising in terms of reliable peak load handling within large geothermal fields.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.