To achieve a better blasting effect of ultra-long and deep buried spiral tunnel with a small radius, it is necessary to study the dynamic response and disturbance of blasting construction. As the engineering background with a poor engineering geological condition, this paper uses the Midi spiral-tunnel in Yunnan province that has a small radius of curvature, a large burial depth, and a large excavation distance. The blasting load is determined first by calculation. Under different blasting construction parameters, the deformation and dynamic vibration responses of the surrounding rocks are studied using the finite element numerical method. The damage mechanism of rock under the blasting load is analyzed. The tunnel engineering blasting is designed and calculated, and the small distance disturbance design of spiral tunnel blasting construction with a small radius is performed from the excavation method and blasting parameters. The results serve as a reference to reveal the surrounding rock dynamics in blasting construction of the spiral tunnel with a small radius.
Internal erosion caused by broken sewer pipes often leads to ground subsidence in urban area, which is a major risk to public safety and has caused substantial socioeconomic loss. In order to ensure the ground stabilization and the safety of buried pipelines, it is necessary to understand the process of internal erosion around a submerged defective pipe. In this paper, the Dynamic Fluid Mesh (DFM) is coupled with the three-dimensional discrete element method (DEM) to simulate internal erosion in gap-graded soils above a defective pipe. In this fluid-solid coupling scheme, the fluid mesh can be generated according to the soil skeleton formed by coarse particles and updated at regular intervals. Seepage forces are calculated and applied on solid particles in the DEM model. The approach accounts for permeability and porosity changes due to soil skeleton deformation and internal erosion. In this study, some gap-graded soils samples with different size ratio are established. A defective pipe is placed below the sample. After that, different hydraulic gradients are applied to the sample. Fine particles are washed away from the hole in the pipe. The results indicate that the erosion process can be divided into three stages according to changes in the erosion rate. In the initial stage, numerous fine particles are washed away, and the flow rate increases with the increase of eroded particles. Subsequently, the erosion rate decreases and the flow rate tends to reach a steady state. Finally, only a small proportion of particles fall down from the outlets and the erosion rate levels off to zero gradually. Parametric studies show that the increase of hydraulic gradient increase the eroded particle mass. The number of erosion particles from the bottom layer is much larger than those from the upper layers as more fine particles in the upper layers are locked.
Abstract. Based on the construction project of Guangshan No.1 tunnel of Jinhong high-speed. The finite difference software is utilized to study the tunnel excavation with 3 different construction methods, the surrounding rock stress, displacement and plastic zone are analyzed. The influence of different construction methods on the surrounding rock and support of tunnel is determined, some suggestions and the optimization scheme have been proposed, which could also be recommended for similar future projects.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.