This paper presents a study piloted on highway assets Category 2 defects. Imminent hazards on highway road networks are significantly accelerated by structural deterioration of highway infrastructures. The inspection and maintenance strategy for highway infrastructure requires continuous improvements to reduce high occurrence of defective highway assets. Combined risk-based inspection (RBI) and stochastic (STOC) techniques is considered in this investigation to give an in-depth understanding of highway asset maintenance response. Appropriate data information is extracted from Network Maintenance Management System and complementary information elicited from maintenance experts as well as recommended standards. Safety inspections piloted within the period of 5 years is evaluated using the projected RBI-STOC approach. The RBI incorporates the consequences and likelihood of the defects and the combined STOC techniques utilised defines the actual maintenance interval operated. The RBI-STOC approach proposes reclassification of highway asset defect repair intervals, appropriate maintenance task response and efficient maintenance prioritisation of highway assets in equivalence with contribution to system average mean time to repair and downtime.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.