Renewable energy has become the most prominent source of energy to reduce carbon emissions around the globe. Undoubtedly, hydro energy is very much clean energy among other sources. In Bangladesh, hydro energy is available only in a specific southern area contributing several hundred megawatts to the national grid. This paper devotes to assessing the capacity and practicability of a hydropower plant to boost the power output by implementing the combined cycle hydropower system. The proposed method has been developed by 1) studying the existing plant based on surveyed data, 2) selecting the site for installing the hydrokinetic turbine, 3) designing with consideration of numerous constraints of inter dependability, and 4) creating a prototype model to ensure the practicability. Preliminary results show that a significant amount of additional electric energy can be generated from the plant with higher efficiency.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.