Summary The settlement is regarded as an important index in underground engineering. When tunneling under across the operational subway tunnel, settlement of the operational tunnel should be monitored. To control the tunneling‐induced movement of the operational subway tunnel, the operation parameters of mechanized‐tunneling, namely, face and grout pressures, should be kept in a specific range. A hybrid approach is proposed utilizing uniform design method, and radial basis function neural network to develop the relation of settlement and related influential factors. Such connection is used as a tuning module for tunneling boring machine (TBM). Furthermore, implementing total station robot and soft computing method of support vector machine (SVM), a forecast model for settlement of the rail is established. The prediction tool SVM is improved by using the particle swarm optimization. Parameters c and g from the SVM and γ in the kernel function of the SVM are optimized using the particle swarm optimization. An illustrative case in Changsha Metro Line 3 constructing under the Metro Line 1 tunnel validates the prediction model. The feasibility of the metamodel is demonstrated by means of the example.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.