Centurion is an expendable heavy lift launch vehicle (HLLV) family for launching lunar exploration missions. Each vehicle in the family is built around a common two-stage core. The first stage of the core uses kerosene (RP-1) fuel and utilizes four staged-combustion RD-180 rocket engines. The upper stages consist of liquid oxygen (LOX)/liquid hydrogen (LH2) propellant with three 220,000 lb thrust-class expander rocket engines. The larger variants in the Centurion family will also use either one or two pairs of five-segment solid rocket motors which are now being developed by ATK Thiokol. The Centurion family consists of three vehicles denoted as C-1, C-2, and C-3. The first vehicle (C-1) is a four RD-180 core with a LOX/LH2 upper stage. The C-1 is designed to deliver a 35 metric ton (MT) CEV to a 300 km X 1000 km highly elliptical orbit (HEO). This HEO allows the CEV to more easily transfer to a lunar trajectory, while still having the ability to abort after one revolution. The C-1 also is designed to meet mission requirements with a failure of both one RD-180 and one upper stage engine. The C-2 and C-3 Centurions are both cargo carrying variants which carry 100 MT and 142 MT of cargo to a 407 km low earth orbit (LEO) respectively. The C-2 utilizes two five-segment solid rocket boosters (SRB), while the C-3 uses four SRBs. Details of the conceptual design process used for Centurion are included in this paper. The disciplines used in the design include configuration, aerodynamics, propulsion design and selection, trajectory, mass properties, structural design, aeroheating and thermal protection systems (TPS), cost, operations, and reliability and safety. Each of these disciplines was computed using a conceptual design tool similar to that used in industry. These disciplines were then combined into an integrated design team process and used to minimize the gross weight of the C-1 variant. The C-2 and C-3 variants were simulated using the C-1 optimized core with different configurations of SRBs. Each of the variants recurring and non-recurring costs were computed. The total development cost including the design, development, testing and evaluation (DDT&E) cost and a new launch pad at Kennedy Space Center (KSC), was $7.98 B FY'04. The theoretical first unit (TFU) cost for the C-2 variant was $532 M FY'04. A summary of design disciplines as well as the economic results are included. Nomenclature Al-Li = Aluminum-Lithium CAD = computer aided design CER = cost estimating relationship
Artemis is a reusable excursion vehicle for lunar landing missions. It is intended to transport a notional CEV vehicle from low lunar orbit (LLO) to the lunar surface. It can be reused by refueling the vehicle in LLO. Artemis is nominally sized to carry a 10 MT payload to the lunar surface and then return it to LLO.Artemis is powered by four liquid oxygen and liquid hydrogen fueled RL-10 engines. These RL-10 engines provide the necessary thrust and allow the Artemis lander to complete its nominal mission with two engines inoperative. The Artemis lander has volume margin built into its propellant tanks. This volume margin combined with an innovative cross-feed system allows Artemis to complete its ascent from the lunar surface with a propellant tank failure. This cross-feed system also allows Artemis to adjust the center of gravity (cg) of the vehicle by transferring propellant among the propellant tanks. Artemis lands on the moon with six articulating legs. This provides redundancy against a leg failure on landing and provides Artemis with the ability to land on uneven terrain.This vehicle is designed to be launched by a heavy-lift evolved expendable launch vehicle (EELV). This design constraint results in the distinct shape of the lander. Artemis is launched as a compact cylinder in the EELV payload shroud, and then autonomously assembles itself via robotic arms similar to those currently used by the shuttle program.Details of the conceptual design process used for Artemis are included in this paper. The disciplines used in the design include configuration, propulsion design and selection, trajectory, mass properties, structural design, cost, operations, and reliability and safety. Each of these disciplines was computed using a conceptual design tool similar to that used in industry. These disciplines were then combined into an integrated design team process and used to minimize the gross weight of the Artemis. Once the design process was completed, a parametric Excel based model was created from the point design. This model can be used to resize Artemis for changing system metrics (such as payload) as well as changing technologies.The Artemis recurring and non-recurring costs were also computed. The total development cost including the design, development, testing and evaluation (DDT&E) cost is $2.17 B FY'04. The theoretical first unit (TFU) cost is $303 M FY'04. Trade studies on life cycle costs (LCC) vs. fuel cost to LLO as well as flight rate are also discussed. A summary of design disciplines as well as the economic results are included. Nomenclature CAD = computer aided design CER = cost estimating relationship
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.