-Probability of ignition due to arc-fault and energy of the arc-fault for the case of applying serial arc-fault interruption time of 120 V defined in UL 1699 to the voltage of 220 V of domestic condition and also for the case of applying it to the HIV wire type are analyzed. It has been confirmed that when the arc-fault occurs under 5 A, 10 A, and 20 A. Probability of ignition for the three different current conditions is 0.74(74%), 0.48(48%), and 0.32(32%) respectively for respective interruption time within 1 sec, 0.4 sec, and 0.2 sec. We discover that when we apply the same arc interruption time for 120 V defined in UL 1699 to the domestic environment of 220 V. The probability of ignition increases from 1.5% for 120 V condition to as much as 74% for 220 V condition. Conclusively, if we apply the standard for the serial arc-fault interruption time defined in UL 1699 for 120 V to the domestic condition of 220 V, the fire prevention effect of electric fire due to arc-fault equal to that of UL standard of 120 V can not be achieved.
-Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.
-As increase of nonlinear loads and renewable energy generators (REGs) being connected to power distribution system via inverters, the concern on harmonic problems have increased. Recently, the harmonics evaluation method considering TDD (Total Demand Distortion) is used to analyze the effect of harmonics from inverters on power distribution quality. Harmonic current sources are typically used for simulation of nonlinear load. Most inverter type for REGs is voltage source inverter (VSI). So, harmonic voltage sources are more suitable to analyze impact of renewable energy generator on harmonics problem in power distribution system. In this paper, we presented the circuit model to analyze interaction between harmonics from nonlinear load and REGs. We verified that the harmonic analysis using the proposed circuit model is more appropriate than the harmonics evaluation method considering TDD through case study using PSCAD/EMTDC.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.