2018
DOI: 10.22227/1997-0935.2018.12.1474-1481
|View full text |Cite
|
Sign up to set email alerts
|

A model of organization life cycle of a medical building

Abstract: Introduction. An approach to the development of the organizational-technological model of the life cycle of a medical facility building is presented. Buildings of medical organizations have a number of features in the design, construction and operation. The buildings of nuclear medicine are subject to particularly high requirements of radiation and fire safety. Materials and methods. To organize the design, construction and maintenance of medical buildings, it is advisable to create and develop an organization… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…The difference in elevation marks in the premises, adopted in the design of the reconstruction of the health facility, is most often explained by the functional purpose of the premises, the location of these premises, as well as due not only to elevation (constructive) marks of the premises, but also the possible laying of engineering communications under the ceiling in trays or boxes. [8,9] The data of the research can be considered on the example of a fragment of the specification of the premises, given in Table 1, obtained from the design documentation for the reconstruction of the building No. 2 of the state budgetary institution "The Blood Transfusion Station of the Moscow Healthcare Department", at: 125284, Moscow, Polykarpova Street, 14, Bld.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The difference in elevation marks in the premises, adopted in the design of the reconstruction of the health facility, is most often explained by the functional purpose of the premises, the location of these premises, as well as due not only to elevation (constructive) marks of the premises, but also the possible laying of engineering communications under the ceiling in trays or boxes. [8,9] The data of the research can be considered on the example of a fragment of the specification of the premises, given in Table 1, obtained from the design documentation for the reconstruction of the building No. 2 of the state budgetary institution "The Blood Transfusion Station of the Moscow Healthcare Department", at: 125284, Moscow, Polykarpova Street, 14, Bld.…”
Section: Methodsmentioning
confidence: 99%
“…The number of employees and engineering and technical workers is: = ሺ * * ሻ where CIW -total cost of construction and installation work (421,318 rubles); W -average output per month per worker (330,000 rubles); Т -duration of work in months (9 months per object analogue); n -number of shifts (2 shifts per object analogue); А -number of people* (71 -calculated value). [Example The average number of N workers employed in construction and installation work is determined by the formula: = × 167 where Тр -labor costs for construction and installation work, man-hour (30060);Тn -duration of work in months (9 months for an analogue object); 167 -average monthly number of working hours; N -number of people ** (20 people -estimated value) [9].…”
mentioning
confidence: 99%