Safety, Reliability and Risk Analysis 2013
DOI: 10.1201/b15938-114
|View full text |Cite
|
Sign up to set email alerts
|

A multi-criteria decision model to determine intervals of preventive maintenance with equipment reliability degradation due to imperfect maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(17 citation statements)
references
References 2 publications
0
17
0
Order By: Relevance
“…installing separate blades instead of one assembled rotor, a decrease in the installation duration may be made by up to 30 % (Barlow et al, 2015). Another study done by Dowell et al (2013) also showed a significant decrease in delay for lifting operations with higher wind restrictions. Considering the high vessel charter rates, delay decrease may in turn contribute to large cost reductions.…”
Section: Weather Restrictionsmentioning
confidence: 87%
“…installing separate blades instead of one assembled rotor, a decrease in the installation duration may be made by up to 30 % (Barlow et al, 2015). Another study done by Dowell et al (2013) also showed a significant decrease in delay for lifting operations with higher wind restrictions. Considering the high vessel charter rates, delay decrease may in turn contribute to large cost reductions.…”
Section: Weather Restrictionsmentioning
confidence: 87%
“…This is achieved through effective remote monitoring, timely availability and access of crew, vessels and helicopters (depending on the distance to the shore, weather and sea conditions). For any given scheduled maintenance operation or failure repair, there is a chance that harsh weather will render the site inaccessible or the operation unsafe to attempt or complete (Dowell et al 2014).…”
Section: Maintenance Strategiesmentioning
confidence: 99%
“…When a failure occurs during the winter season, sometimes access to turbines is inaccessible for long periods, resulting in a long periods of downtime and production losses [12]. For example, a transfer system limited by a significant wave height <1.5m, the wait for better conditions of sea is about four days in the summer, 10-15 days in spring and autumn and between 2 and 6 weeks of winter [13].…”
Section: B Optimization Of Operational Resources For the Maintenancementioning
confidence: 99%