2007 IEEE International Conference on Industrial Engineering and Engineering Management 2007
DOI: 10.1109/ieem.2007.4419345
|View full text |Cite
|
Sign up to set email alerts
|

A new formula to "Estimate At Completion" of a Project's time to improve "Earned Value Management System"

Abstract: This paper presents a new method for Estimate at Completion (EAC) of project's time to improve earned value management system (EVMS). The new formula established consists of four variables: Scheduled Performance Index (SPI), Scheduled Percent Complete by Duration (SPCD), Actual Percent Complete by Duration (APCD), and Sum of Durations to Due Time (SDDT). The model has been validated by a simulation study using a progress generator program for typical RCPS problem project library. This program was developed in … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2009
2009
2019
2019

Publication Types

Select...
3
2
2

Relationship

0
7

Authors

Journals

citations
Cited by 17 publications
(12 citation statements)
references
References 5 publications
0
10
0
Order By: Relevance
“…Moreover, determining the ownership share of partners with MODM (MultiObjective Decision Making) approach with the neural network (Kimiagari et al,2010), ranking International strategic Alliance project delaying factors (Iranmanesh et al,. 2007), ranking the stakeholder(s) involvement challenges in International strategic alliance project (Kimiagari et al,.…”
Section: Resultsmentioning
confidence: 99%
“…Moreover, determining the ownership share of partners with MODM (MultiObjective Decision Making) approach with the neural network (Kimiagari et al,2010), ranking International strategic Alliance project delaying factors (Iranmanesh et al,. 2007), ranking the stakeholder(s) involvement challenges in International strategic alliance project (Kimiagari et al,.…”
Section: Resultsmentioning
confidence: 99%
“…These data was generated through a project simulator which was previously developed by VBA-MSP tools in Microsoft Project software for other studies by authors. For more information about its structure may refer to Iranmanesh et al (2007), (2008) and Iranmanesh and Hojjati Tavassoli (2008). It reads sample project file, which is in text format, and makes corresponding Microsoft Project file.…”
Section: Input and Output Data Configurationmentioning
confidence: 99%
“…A new method for EAC (Iranmanesh et al 2007) of project's time to improve EVMS in 2007 was presented. The A-12 program, On 7 January 1991 cancelled because of certainly the problem of estimating its completed cost (Morrison 1991) and caused interest in forecasting the completed cost of a defense contract as an important contributing factor, a term EAC.…”
Section: General Review Of Evms Measuresmentioning
confidence: 99%
See 1 more Smart Citation
“…Many research studies have been dedicated to this area to enhance and to show its capabilities [3] [8]. Early finding of actual or forecast cost overrun in the field of construction projects is vital to assist project managers [6].…”
Section: Introductionmentioning
confidence: 99%