2021
DOI: 10.3389/fenrg.2021.646975
|View full text |Cite
|
Sign up to set email alerts
|

A Two-Stage Dispatching Method for Wind-Hydropower-Pumped Storage Integrated Power Systems

Abstract: With the fossil energy crisis and environmental pollution, wind energy and other renewable energy have been booming. However, the strong intermittence and volatility of wind power make difficult of its integration into grid. To solve this problem, this study proposes a complementary power generation model of wind-hydropower-pumped storage systems, which uses hydropower and pumped storage to adjust the fluctuation of wind power. How to consider the uncertainty and unpredictability of wind power output and make … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 33 publications
0
7
0
Order By: Relevance
“…The continuous, rapid, and uneven power demand growth and the rapid development of renewable energy sources have put forward higher requirements for achieving power balance in the regional unified power market. In order to achieve power balance and ensure regular regional power trading, this paper designs a calculation method for regional power balance and trading potential assessment, which not only gives the deterministic abandonment amount of wind power and photovoltaic power but also improves the accuracy of power balance analysis compared with the traditional power balance method (Hu et al, 2021), and provides a guarantee for regular trading in the power market (Zeng et al, 2017;Ji et al, 2021;Wang et al, 2021;Xu et al, 2022).…”
Section: Power Balance Index and Calculation Methodsmentioning
confidence: 99%
“…The continuous, rapid, and uneven power demand growth and the rapid development of renewable energy sources have put forward higher requirements for achieving power balance in the regional unified power market. In order to achieve power balance and ensure regular regional power trading, this paper designs a calculation method for regional power balance and trading potential assessment, which not only gives the deterministic abandonment amount of wind power and photovoltaic power but also improves the accuracy of power balance analysis compared with the traditional power balance method (Hu et al, 2021), and provides a guarantee for regular trading in the power market (Zeng et al, 2017;Ji et al, 2021;Wang et al, 2021;Xu et al, 2022).…”
Section: Power Balance Index and Calculation Methodsmentioning
confidence: 99%
“…A minority of research considers a shorter timeframe in which the photovoltaic generation nowcasting could be exploited. Recognizing the inevitable errors in predicting wind power generation day ahead, Hu et al (2021) propose a 2-stage dispatch, day-ahead and realtime, to exploit the more accurate short-term forecast; a similar approach is applicable to photovoltaic dispatch if short-term solar irradiation forecasts are available. Das et al (2021) propose to optimize photovoltaic generation and battery storage use in the context of hourly changing electricity prices.…”
Section: Nowcasting For Vpp With Photovoltaic Generationmentioning
confidence: 99%
“…Elkazaz et al (2020) consider a household with local photovoltaic generation and battery storage, and propose a scheme consisting of day-ahead optimization as well as real-time control to manage the errors caused to the optimization by uncertain forecasts. Elkazaz et al (2020), Das et al (2021), Hu et al (2021) are all examples of methods that use real-time measurements as the input to an algorithm that handles the error of medium-term renewable generation forecasts, so an obvious line of further research would be to exploit nowcasting. Nefedov et al (2018) exploit electric vehicle batteries for short-term storage of surplus photovoltaic energy, updating plans as vehicles arrive or if they leave unexpectedly.…”
Section: Nowcasting For Vpp With Photovoltaic Generationmentioning
confidence: 99%
“…The equivalent load duration curve after deduction of the imported energy and priority generation energy is shown in Figure 3. Due to limitation in reservoir capacity and unit rated power, power and energy constraints of hydropower and pumped storage plants can be expressed as (Hu et al, 2021). where P H (s, t) and P P (s, t) represent the output of hydropower plant and pumped storage plant, respectively, in period t under scenario s. P max At present, the power market in China is similar to the pool mode, and there is no awareness in market bidding on the demand side.…”
Section: Planning-market Electricity Allocation Model Of Pxmentioning
confidence: 99%