2003
DOI: 10.1080/15325000390248819
|View full text |Cite
|
Sign up to set email alerts
|

An Implementation of the Stochastic OPF Problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2005
2005
2017
2017

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…Let z t ¼ ðP d1 t ; P w t Þ, ct2T be the vector of the environmental parameters, including the first category of loads and undispatchable WP generation which has been totally accessed to the grid. The system uncertainty includes both the available WP described by (14) and the second category of the loads described by (16). For a 24-h dispatch horizon, let l ¼ (l 1 , /, l 24 ) be the vector of nodal prices l t ¼ ðl t1 ; /; l tN d Þ T for each bus at time t, which is determined by x, y and z through multi-period OPF calculation expressed as l t ¼ l t ðx t ; y t ; z t Þ T , ct2T .…”
Section: Objective Function Modelmentioning
confidence: 99%
See 3 more Smart Citations
“…Let z t ¼ ðP d1 t ; P w t Þ, ct2T be the vector of the environmental parameters, including the first category of loads and undispatchable WP generation which has been totally accessed to the grid. The system uncertainty includes both the available WP described by (14) and the second category of the loads described by (16). For a 24-h dispatch horizon, let l ¼ (l 1 , /, l 24 ) be the vector of nodal prices l t ¼ ðl t1 ; /; l tN d Þ T for each bus at time t, which is determined by x, y and z through multi-period OPF calculation expressed as l t ¼ l t ðx t ; y t ; z t Þ T , ct2T .…”
Section: Objective Function Modelmentioning
confidence: 99%
“…For calculation convenience, the power factor of each load computed from the load data is kept constant. The uncertainty in load is simulated by (16). The maximum load is set to 120% of the total load at each bus.…”
Section: Assumptions For 30-bus Systemmentioning
confidence: 99%
See 2 more Smart Citations
“…Risk-based optimal power flow (RBOPF) [3][4][5][6][7][8][9][10][11][12] is an emerging new approach proposed in previous work. Existing literature on this subject shows that system operating risk can be mitigated in expectation by jointly optimizing the pre-contingency dispatch and the post-contingency recourse in a twostage stochastic programming framework [3,[9][10][11][12]. Compared with the SCOPF, such stochastic RBOPF (S-RBOPF) problems account for the probabilistic nature of system conditions and can quantify and manage system operating risk.…”
Section: Motivationmentioning
confidence: 99%