2022
DOI: 10.3390/su14063410
|View full text |Cite
|
Sign up to set email alerts
|

Beneficial Effects of 3D BIM for Pre-Empting Waste during the Planning and Design Stage of Building and Waste Reduction Strategies

Abstract: The use of various tools for construction waste management throughout the planning and design (P&D) stage has several advantages. According to some research, building information modelling, or BIM, could be a valuable tool for predicting waste. This paper discusses how BIM could be used for pre-empting waste and reducing the course of the planning and design process of constructing a building. In Malaysia, a questionnaire survey of 340 construction experts was undertaken. Simultaneously, a regression analy… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 12 publications
(3 citation statements)
references
References 72 publications
0
3
0
Order By: Relevance
“…According to previous studies, the PLS-SEM analysis method was used in different fields, such as the transportation sector [59][60][61], construction industry [62][63][64], competitive performance [65], education [66,67] and management [68,69]. Therefore, as PLS-SEM is considered a failed method to apply the SEM and test the model hypotheses, the present study employed PLS-SEM to measure the influence of work environment on drivers' performance.…”
Section: Structured Equation Modelling As An Analysis Methods (Pls-sem)mentioning
confidence: 99%
“…According to previous studies, the PLS-SEM analysis method was used in different fields, such as the transportation sector [59][60][61], construction industry [62][63][64], competitive performance [65], education [66,67] and management [68,69]. Therefore, as PLS-SEM is considered a failed method to apply the SEM and test the model hypotheses, the present study employed PLS-SEM to measure the influence of work environment on drivers' performance.…”
Section: Structured Equation Modelling As An Analysis Methods (Pls-sem)mentioning
confidence: 99%
“…BIM has been widely used in various stages of construction projects [19,20]. In the planning stage, the application value of BIM is reflected in the aspects of site analysis, architectural planning, and scheme demonstration [21,22]. It can compare and simulate the lighting, layout, vision, and ergonomics of different design schemes, so as to evaluate the cost, time, and income of different schemes in many aspects and provide a reliable basis for the owner's final scheme selection.…”
Section: Introductionmentioning
confidence: 99%
“…Researchers' findings based on previous studies about the environmental impact of using BIM include, among other things, the efficiency of energy use in BIM implementation (Abanda & Byers, 2016;Beazley et al, 2017;Mahiwal et al, 2021), BIM contributes to reducing emissions (Bonenberg & Wei, 2015;B. Cheng et al, 2020;Mohammed et al, 2022) and establishing a warm environment nyaman (Gan et al, 2021;B. Wang et al, 2021;Wei et al, 2021).…”
Section: Introductionmentioning
confidence: 99%