Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling

Abstract: Despite theoretical advancements in alternative project planning methods the extent of their practical implementation varies strongly; it has been limited especially in the US construction industry. The family of linear, repetitive, and location-based scheduling techniques holds significant but barely substantiated promise by containing multiple variables of interest for integrated analysis and optimization. Yet it is necessary to provide empirical evidence that using such techniques can improve productivity t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
36
0
4

Year Published

2014
2014
2025
2025

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 39 publications
(41 citation statements)
references
References 50 publications
1
36
0
4
Order By: Relevance
“…The offshore oil and gas literature indicated a preference for using CPM as other industries (Galloway 2006), when planning construction (Carvalho and Pinto 2006;Gomarn and Pongpeng 2018;Norstad et al 2017;Sabri et al 2015), production (Findlay et al 1989;Lang and Zhao 2016) and maintenance (Alonso et al 2018;Halvorsen-Weare and Fagerholt 2017). None of these consider resource leveling or workflow as Olivieri et al (2018), neither did they consider productivity as Lucko et al (2014) and Seppänen et al (2014). In comparison to the provided CPM schedule the LBMS schedule illustrated inconsistency, which supports Olivieri et al (2018) results, but they also found that CPM had similar feature for critical activities.…”
Section: Discussion Resultsmentioning
confidence: 99%
“…The offshore oil and gas literature indicated a preference for using CPM as other industries (Galloway 2006), when planning construction (Carvalho and Pinto 2006;Gomarn and Pongpeng 2018;Norstad et al 2017;Sabri et al 2015), production (Findlay et al 1989;Lang and Zhao 2016) and maintenance (Alonso et al 2018;Halvorsen-Weare and Fagerholt 2017). None of these consider resource leveling or workflow as Olivieri et al (2018), neither did they consider productivity as Lucko et al (2014) and Seppänen et al (2014). In comparison to the provided CPM schedule the LBMS schedule illustrated inconsistency, which supports Olivieri et al (2018) results, but they also found that CPM had similar feature for critical activities.…”
Section: Discussion Resultsmentioning
confidence: 99%
“…This is important information for the planning of lengthy projects like highways. Apart from this, there is other information that is easily available on location-based scheduling charts such as lead time, synchrony, concurrency, work-in-progress, sequence, direction, interfering trades and buffer (Lucko et al 2014).…”
Section: Need For Lbp For Highway Projectsmentioning
confidence: 99%
“…Esta desvantagem é contornada pela utilização de gráficos coloridos (ARDITI; ALBULAK, 1986) ou formação de células de produção. Uma revisão atualizada de artigos de LOB foi realizada por Lucko et al (2013) em um trabalho que objetiva preencher a lacuna de conhecimento sobre estudos quantitativos de produtividade em planejamento por linha de balanço.…”
Section: Linha De Balançounclassified
“…Trabalhos assinalam o uso da LOB apenas como uma ferramenta de planejamento na implantação da construção enxuta (SOUZA ET AL., 2005; BARBOSA ET AL., 2013), mas há autores que exploraram a Linha de Balanço como uma ferramenta que detém várias características lean (MATOS ET Al., 2009;MONTEIRO ET Al., 2011;CARNEIRO ET AL., 2012;LUCKO ET AL., 2013;HEINECK, 2014).…”
unclassified